Retaining 45V commencement of construction through at least December 31, 2029, would allow for the minimum runway needed for the multi-year development cycles these projects require. With political clarity and investment certainty, the 45V credit can catalyze tens of billions in private capital, revitalize domestic manufacturing, and create stable, long-term employment in construction, operations, and technology innovation.